banner 7

HomeMilestones

NEMOH Milestone

Access links to milestones are available in the restricted area

 new openachieved,   new next in preparation, Plus not in the original proposal

Status  Month WP
N
Milestones Lead benef.
 new open 02/2012 9 NM.1 Kick-off Meeting
INGV
 new open 03/2012 1,2 RD.1.1 1. Experimental benchmarks. Partners INGV, DEES, DESB, ULANC involved in experimental activities provide a description of the existing experimental devices and resources, to be posted in the NEMOH web ULANC
 new open
 
03/2012  3,4,5,6 RD.1.2 2. Numerical benchmarks. Partners INGV, UCD, DESB, BSC, BRGM, UNIGE involved in numerical studies provide benchmarks of existing codes and description of input/outputs, to be posted in the NEMOH web. DESB
 new open 03/2012  7 RD.1.3 3. Hazard evaluation benchmark. Partners INGV, AA, I2EM provide a description of the existing tools, to be posted in the web INGV
 new open 04/2012 9,10 DO.1 Opening of NEMOH web site INGV
 new open 06/2012 12,3,4,5,6,7 RD.2.1 1. Definition of test cases. All Partners agree on common test cases that will be investigated in the course of ESR activities.  INGV
 new open
 
06/2012 7 RD.2.2 2. Hazard evaluation recommendation. Partners DPC and INGV provide statements on stakeholder needs for volcanic hazard evaluation INGV 
 new open 09/2012 10 DO.2 Dissemination Plan (futher improved throughout project) INGV
 new open 11/2012 8 TE.1 Network School S1 organization assessment: The final schedule and organization details of School S1 are provided DEES
 new open 12/2012 7 RD.3 Hazard evaluation 1. First exercise on expert elicitation methods for hazard evaluation, comparison of methods by partners INGV, A&A, I2EM. Stakeholder test by partner DPC. Ex. 1 - Ex. 2 INGV
 new open 02/2013 8 TE.3 School S1 evaluation: The results of a questionnaire to ESRs on quality and organization of School S1 are distributed. The SB will use them for recommendations on next School DEES
 new next 02/2013 7 RD.4 1. Hazard assessment benchmark. Partners INGV, A&A,I2EM provide a common statement, to be posted in the web, on similarities and differences  between approaches INGV
 new open 02/2013 7 RD.4 2. Stakeholder benchmark on hazard forecast methods. Partners DPC and INGV provide a common statement on benefits/needs from deterministic and probabilistic approaches INGV
 new open 06/2013 1,2,3,4,5 RD.5 Constitutive equations 1: Constitutive equations from WPs 1,2 are defined, for use in numerical models at WPs 3,4,5 DEES
 new open 08/2013 1,2,3,4,5 RD.6 Model-Laboratory feedback stage: Advice to lab-based studies from numerical modelling studies on further experiments and quantities to be measured and parameterized INGV
 new open 09/2013 8 TE.4 Network School S2 organization assessment. The final schedule and organization details of School S2 are provided DESB
 new open 10/2013 9 NM.5 Mid-term Project Review INGV
 new open 10/2013 7 RD.7 Hazard evaluation 2. Second exercise on expert elicitation methods for hazard evaluation, comparison of methods by partners INGV, A&A, I2EM. Stakeholder test by partner DPC INGV
 new open 12/2012 10 DO.3 First Network Newsletter (released 12/2012) INGV
Plus Second Network Newsletter
Plus Third Network Newsletter
 new open 12/2013 8 TE.6 School S2 evaluation. The results of a questionnaire to ESRs on the quality and organization of School S2 are distributed. The SB will use them for recommendations on next Schools. Table of Responses DESB
 new open 12/2013 4,5 RD.8 Inverse analysis test. Inverse analysis methods are tested by inverting model-produced geophysical signals UCD
 new open 04/2014 1,2,3,4,5 RD.9 Constitutive equations 2. Computation of the H2O+CO2 saturation conditions (re: Papale et al., 2006), density (Lange, 1994) and viscosity (Giordano et al., 2008), of liquid and liquid+bubbles magmas of any composition and for any P-T condition.. DEES
Plus 08/2014 NEMOH Field School in Iceland organizzation assessment. IES
 new open 09/2014 8 TE.8 Network School S3 organization assessment. The final schedule and organization details of School S3 are provided UCD
 new open 10/2014 7 RD.10 Hazard evaluation 3. Third exercise on expert elicitation methods for hazard evaluation, comparison of methods by partners INGV, A&A, I2EM. Stakeholder test by partner DPC INGV
Plus 4th NEMOH Newsletter
 new open 12/2014 8 TE.10 School S3 evaluation. The results of a questionnaire to ESRs on the quality and organization of School S3 are distributed. The SB will use them for recommendations on next Schools UCD
Plus Spontaneous feedback by NEMOH fellows about schools in Dublin and Iceland
 new open 12/2014 1,2,3,4,5  RD.11 1. Code validation test. Numerical codes are compared with lab experiments, simple analytical solutions, and real cases BRGM (INGV contribution)
 new open 12/2014 6,7 RD.11 2. Probabilistic sensitivity analysis test. New developed methods by DMA are tested at INGV through applications with selected numerical codes (included in the School S4) INGV
 new open 12/2014 1,2,3,4,5,6,7 RD.11 3. Volcanic scenario evaluation. Preliminary volcanic scenarios are evaluated, and further activities are identified (included in the School S4) INGV
 new open 04/2015 7 RD.12 Stakeholder benchmark on volcanic scenario evaluation. Partner DPC analyses the volcanic scenarios provided in terms of stakeholder needs (included in the School S4) INGV
Plus 04/2015 Short Course in Pisa evaluation INGV
Plus NEMOH Newsletter N.5
 new open 08/2015 10 DO.6 Second Network Newsletter (original) INGV
 new open 09/2015 8 TE.12 Network School S4 organization assessment. The final schedule and organization details of School S4 are provided INGV
 new open 09/2015  10 DO.7 Final Conference organization. Schedule and organization details of the Final Conference INGV
 new open 10/2015 7 RD.13 Hazard evaluation 4. Fourth exercise on expert elicitation methods for hazard evaluation, comparison of methods by partners INGV, A&A, I2EM. Stakeholder test by partner DPC INGV
 new open 10/2015 10 DO.9 Final volume set-up. Schedule and terms for Final Volume INGV
 new open 12/2015 8 TE.14

School S4 evaluation. The results of a questionnaire to ESRs on the quality and organization of School S4 are distributed (Table)

INGV
 new open 12/2015 7 RD.14 Recommended Best Practice for hazard assessment. A document is produced describing the outcomes of NEMOH in terms of Best Practice for volcanic hazard assessment INGV
 

Follow @nemoh_itn

QR-nemoh2